Project: CPF CASE Electrification Oil & Gas
Publicado el 05/05/2025

Project: CPF CASE Electrification

Project: CPF CASE Electrification
City: Añelo
Duration: 406 days
Year: 2023 – 2024
Features:
The project involved the execution of the following tasks:

  • Construction of reinforced concrete foundations for:
    • Electrical Room
    • Lighting Poles
    • Lightning Rod Masts
    • Disconnect Switch Supports
    • Medium Voltage Line Terminations (LAMT)
    • Compact Transformer Substation (CCT) at the Pumping Station
  • Installation of electrical and instrumentation conduits (manholes and duct banks)
  • Construction of grounding system for the transformer substation
  • Construction of perimeter fencing, including gates and doors
  • Installation of:
    • Support structure for the Electrical Room
    • Electrical Room
    • Lighting Poles
    • Lightning Rod Masts
    • Cable tray conduit systems
    • Isolators
    • Reclosers
  • Construction of medium voltage overhead lines
  • Laying and connection of medium voltage conductors
  • Laying and connection of control conductors