Project: CPF CASE Electrification
City: Añelo
Duration: 406 days
Year: 2023 – 2024
Features:
The project involved the execution of the following tasks:
- Construction
of reinforced concrete foundations for:
- Electrical
Room
- Lighting
Poles
- Lightning
Rod Masts
- Disconnect
Switch Supports
- Medium
Voltage Line Terminations (LAMT)
- Compact
Transformer Substation (CCT) at the Pumping Station
- Installation
of electrical and instrumentation conduits (manholes and duct banks)
- Construction
of grounding system for the transformer substation
- Construction
of perimeter fencing, including gates and doors
- Installation
of:
- Support
structure for the Electrical Room
- Electrical
Room
- Lighting
Poles
- Lightning
Rod Masts
- Cable
tray conduit systems
- Isolators
- Reclosers
- Construction
of medium voltage overhead lines
- Laying
and connection of medium voltage conductors
- Laying
and connection of control conductors